Shaoguan Junyuan Hydroelectric Power Development Co. Ltd.
Implementing Partners
Evernal; Foshan Huaheng and Guangdong Fong Sha Group.
Duration
Has been operating since March 2006.
Brief
The hydroelectric asset has a total installed capacity of 12MW with three water turbines. The overall utilisation time of equipment is above 3500 hours per annum with 40,000,000 kwh the amount of power generated, with annual income of approximately RMB 45,000,000.
-
Renhua Huayue Gangue Electric Power Limited
Implementing Partners
Foshan Huaheng has a controlling interest.
Duration
Has been operating since 2007.
Brief
Hua Yue utilises and recycles the by-products and residue from coal mining activities, with FGD technology utilised to generate power economically. This asset serves as a key support to the local power grid and at the same time protects the soil from contamination by local coal dumps.